Concrete mixing
Your current location: 首 页 > Hot push information

Dazhou professional gray basin use

2020-05-19
Dazhou professional gray basin use

Concrete mixing station is the necessary machinery for mixing concrete in construction machinery,灰盆用途With the expansion of China's real estate construction industry, highways, DAMS, hydropower stations and other construction and the promotion of commodity cement,The output of cement products is increased,Concrete mixing plant sales increase,As a result, there have also been different output, different types of mixing stations, widely recognized by the maid customers,And exported to Russia, Europe, India and other countries and regions。In recent years, the mixing station plays an important role in many industries,So that the JS series of mixing station gradually become the leading product of mixing stick cement,JS350 among them,JS500, JS750, JSI000 is a small and medium-sized mixing plant,JS1500, JS2000,J52500, JS3000 is a large mixing equipment,Its processing technology is more complex than the ordinary mixing station,Be a little more demanding,It can also be combined with the batching unit into a simple mixing station。With the increase of mixing plant manufacturers, mixing plant market competition has entered the white heat period, although most enterprises to produce small and medium equipment, but under the pressure of increased competition, mixing plant enterprises are moving toward personalized service, technological innovation, improve the ability of the mixer host,专业灰盆Product diversification and other directions of development。

Dazhou professional gray basin use

Operation and maintenance of concrete batching machine 1, before the shift should check whether the weighing device is in normal working condition, if there is a blockage affecting the weighing accuracy phenomenon should be eliminated in time。2、专业灰盆用途Check whether the wiring of the electrical part is correct and firm, and whether the electrical box shell is firmly grounded。3, in the operation at any time to check whether the operation of each part is normal, the conveyor belt is deviated, there is no foreign matter between the belt and the driven roller, if there is an abnormal situation immediately stop and eliminate。4. Each active part should be filled with butter, and the belt roller should be removed and refueled once a year。5, in the maintenance of the machine, must stop and cut off the main power supply。6, the batching controller should have rainproof, sunscreen and dustproof facilities。7, prevent sand, stone mixed with steel bars, large stones and other debris, so as not to damage the conveyor belt。8, in order to ensure the safety of the batching controller, do not use in severe weather conditions such as wind and rain, thunder, and turn off the main power supply, remove the connection between the sensor and the batching controller, to prevent damage to the controller。9、达州专业灰盆The power supply voltage fluctuation must be less than -5 ~ 5%。10. At least every year, the weighing system should be calibrated according to the scale method in the instruction manual of the batching controller to ensure the accuracy of the weighing。

Dazhou professional gray basin use

The main characteristics of concrete mixing station are as follows: 1.专业灰盆用途The combination structure, modular unit, installation, relocation is very convenient。2.Mixing machine and aggregate lifting adopts JS1000 type double horizontal shaft forced concrete mixer, which has good mixing quality and high efficiency。3.PLD1600 concrete batching machine is used for aggregate batching, which has accurate measurement and high production efficiency。4.灰盆用途The powder is measured by electronic balance with high precision。5.The water is measured by electronic balance, and the batching precision is high。

Dazhou professional gray basin use

1) The ground screw bolt of the cement silo is poured into the reserved pit of the foundation. When the center line of the cement silo support is adjusted to coincide with the center line of the foundation, the above four flanges are adjusted on the same level (measuring method: theodolite or transparent plastic hose with diameter of 8-10 and color water measurement method), the concrete can be selected for casting。The grade of the concrete used in the reserved pit should be one level higher than the concrete used in the foundation, and in the winter construction, in order to shorten the construction period, the concrete used should be added with early strength antifreeze。Wait for the foundation concrete to set 5-7 days before installing the cement silo body. When installing the cement silo body, it is necessary to measure the verticality of the cement silo body with a theodolite. The verticality is one thousandth of the height。In order to shorten the construction period, embedded parts can also be used in infrastructure instead of anchor bolts to fix cement silos or mixers。(2) Installation of the mixing machine: the bottom plane of the mixer chassis is properly padded,Attach the legs to the main engine with hinges,Install the cement scale,水秤,After weighing the admixture,Ready to lift,Measure and adjust engine chassis,Make it horizontal,After the center line of each leg coincides with the center line of the foundation, the anchor bolt can be poured into the reserved pit (or welded between the base and the reserved embedded part)..(3) Installation of other parts: after the installation of the main engine and cement silo,Screw conveyor can be installed,Before hoisting,Check the filling of oil and grease at each lubrication point,An empty car running test is to be conducted,Find problems and solve them in time,Part of the dosing machine installation,Position as required by the foundation drawing,The small dosing machine can be placed on the solid foundation pier plane,Large batching machine requires pouring anchor bolts,After the installation of each mechanical part,Check that all lubrication points of various equipment are filled with lubricating oil (the lubricating oil suitable for low temperature conditions must be replaced in winter in Northeast China) or grease,Wiring and empty car running test can be performed according to the requirements of the manual and electrical schematic diagram.It can accurately and conveniently input, adjust and modify the set value and formula number of each material, and multiple common concrete ratios can be stored inside the microcomputer。2. 专业灰盆The control system has perfect self-locking and interlocking functions to ensure the accurate and reliable operation of the system, and has common fault detection and alarm functions。3. The whole mixing plant is equipped with a good lighting system, and the main control room, mixing area and material area are equipped with lighting。4. The concrete mixing plant uses microcomputer to control the timing requirements of the process, and realizes automatic control of the production process from measurement to feeding, mixing to discharging. The management of the entire production site of the mixing plant is completed by two operators and two auxiliary personnel。5.The weighing system of concrete mixing station is equipped with zero output.灰盆用途Can automatically remove the tare weight, correct the drop, for the single weight single material weighing with a button and fill function, more effectively control the measurement accuracy, with a light alarm device。

Dazhou professional gray basin use

Concrete double horizontal shaft forced mixer is mainly used for mixing various powdered materials。Can produce a variety of powder mixing materials。Its aggregate can be wet fly ash, calcium carbide mud, phosphogypsum, sand, slag and so on。专业灰盆用途It is mainly used as a supporting host for all kinds of standard brick, gray sand brick and other production lines。It is one of the important equipment in the production process of autoclaved fly ash brick and lime sand brick。Concrete double horizontal shaft forced mixer is mainly composed of shell, spiral shaft assembly, drive device, piping, cover plate, chain cover and other components (see the random external drawing) 1 专业灰盆用途The shell is mainly composed of plate and section steel, welded and formed in the factory, and assembled with other components, which is the support of the two-shaft mixer。The shell is tightly sealed, and there will be no phenomenon of flying ash and leaking ash。2 Screw shaft assembly is the main component of double-shaft mixer, its components are mainly left and right spiral shaft, bearing seat, bearing sleeve, bearing cover, gear, sprocket, oil cup, blade and other parts。

标签